INC-001 - INC 001 AAL15 Rollback Incident

INCIDENT REPORT

AAL1.5 Rollback & Rebuild Incident

1. INCIDENT DETAILS


Incident ID INC-001 Status Resolved

Date / Time March 17, 2026 \~09:00 -- 14:30 Duration \~5.5 hours EST

Reported By Shane (Atlantis ITS) Assigned Shane + To Cooper (Coop)

Severity High Priority P1 --- Platform Rebuild

Environment Atlantis ITS --- AAL Platform Version AAL2 → Rolled Affected back to AAL1.5

Resolution Manual rebuild of AAL1.5
Path
components + forced GitHub sync


2. INCIDENT SUMMARY

An upgrade from AAL1.5 to AAL2 failed, necessitating a full rollback. Due to an incomplete backup of the AAL1.5 state prior to the upgrade attempt, the rollback could not be performed cleanly from a snapshot. Shane and Cooper (Coop) spent approximately 5.5 hours manually rebuilding the lost AAL1.5 components and then force-pushed to GitHub to bring the repository back into a consistent, deployable state.

3. ROOT CAUSE ANALYSIS


Category Detail

Primary Cause AAL2 upgrade failed; no full pre-upgrade backup of AAL1.5 existed

Contributing No git tag or local snapshot taken before Factor initiating the version jump

Impact 5.5 hours of manual rebuild time; temporary loss of AAL1.5 stability

Detection Immediate --- upgrade failure was apparent during Method the attempt


4. INCIDENT TIMELINE


Time (EST) Event

\~10:00 AAL2 upgrade initiated

\~15:00 Upgrade failure detected; decision made to roll back to AAL1.5

\~15:30 Rollback attempted --- incomplete backup identified; clean restore not possible

\~16:00--16:45 Shane + Coop begin manual rebuild of missing AAL1.5 components

\~17:00 Rebuild complete; GitHub force-push executed to sync repository

\~17:30 Platform confirmed stable on AAL1.5; incident closed


5. RESOLUTION & ACTIONS TAKEN

  • Manually rebuilt all missing AAL1.5 components with Cooper

{width="3.088771872265967in" height="4.6164085739282585in"}

  • Performed a Git force-push to overwrite remote with corrected local state

{width="5.258980752405949in" height="3.643642825896763in"}

  • Verified platform stability on AAL1.5 post-rebuild

  • Documented incident for process improvement

6. LESSONS LEARNED

  • Always take a complete backup before any AAL version upgrade attempt

  • Use \'git tag AAL1.5-stable\' (or equivalent milestone tag) before pushing to next version

  • Create a local ZIP snapshot to E:\Backups\ as a belt-and-suspenders backup

  • Treat pre-upgrade backup as a mandatory gate, not an optional step

7. CORRECTIVE ACTIONS & FOLLOW-UP


Action Item Owner Due Status

Draft SOP-003: Pre-Upgrade Ozzy / Shane Next Sprint Pending Backup & Rollback Procedure

Add git tagging step to all Shane Immediate In Progress future AAL upgrade workflows

Create backup of AAL15 and AAL20 Shane Immediate Pending to folder E:\Backups

Add INC-001 to Ozzy v14 compile Pending ATLANTIS_AI_MEMORY-v14 footnotes


8. SIGN-OFF


Role Name Date

Incident Lead Shane March 17, 2026

Technical Support Cooper (CoPilot) March 17, 2026

Documented By Ozzy (Claude) March 17, 2026


--- End of Incident Report INC-001 ---